Strategy Journal

Turbines are now being developed with a capacity of 18MW or more. Towers rising more than 100 metres above the water’s surface. Wind Turbines, with 8 MW model have 81-metre turbine blades can power a home for 24 hours. Wind Turbines with 107-metre blade can power a home for two days.

However,  Nacelles weighing 800 to 1,000 tonnes. About $13bn of investment needed for replacing installation vessels for offshore.

Hence, Swedish developer Vattenfall halted a new project in the North Sea due to pressure from inflation and high interest rates. Iberdrola and Shell are also exiting agreements in the US.

 

Wind

Latest Wind Energy News from around the World: Rising raw material cost, SBM Offshore, Haliade-X, Argentina Policy, major component replacement (MCR), H2Mare flagship project, Kincardine Offshore Wind, the Windcatcher

Latest Wind Energy News Global Aug’21

Wind

Latest Wind Energy News from India: Stagnation of Wind, Repowering Wind turbines, The Revised list of models and manufacturers (RLMM), SECI 1200 MW solar wind hybrid at 2.34/unit, 800 MW wind tender, Offshore Wind, Pending payment to developers in Andhra Pradesh

Latest Wind Energy News India Aug’21

Wind

Latest Wind Power News: NTPC ONGC partnership for offshore wind, Saudi entry into India, Siemens Gamesa new order, and Make in India for wind

Latest Wind Power News in India July’21

Wind

Latest Wind Power News: Offshore turbine installation vessels, first floating offshore wind, China’s floating offshore wind, losses for Siemens Gamesa and circular economy

Latest Wind Power News Global July’21